From drawing to a clear decision.

Follow a sample project from setup to report. Explore the drawing, investigate its evidence and compare revisions.

Inside CompliPlan

One project. Every decision connected.

Explore the five stages using a sample apartment. Select a stage to see what happens there.

CP 024 / Apartment 01Interactive sample · No analysis run
Findings

Explore findings on the drawing, inspect their evidence and sources, and record your professional judgement.

GA 101 / General arrangementP03 · 1:50 @ A3Open drawing PDF ↗
Sample apartment plan. Select pin 01 at the entrance or pin 02 in the kitchen.

Select a numbered pin to inspect its evidence. All findings are illustrative.

A traceable review

Follow the evidence.
Keep the judgement yours.

Separate what the drawing already establishes from information that still needs to be provided.

01 / Drawing evidence
Enlarged entrance detail with the explicit 850 mm clear opening dimension

850 mm clear is recorded.

The clear opening is identified. The missing information is the threshold section, not the door width.

02 / Source context
Source context · NI guidance

Technical Booklet R

Access to and use of buildings

“A level threshold should be provided at the principal entrance or alternative entrance”

Extract · paragraph 7.8 · printed page 67

Read the full source ↗

October 2012 base edition. This sample is not a check of current guidance or amendments. Project reviews must use their recorded source versions and scope.

03 / Professional action

Ask the right question.

Request a threshold section to establish the level transition and construction. Keep the recorded clear opening as evidence.

Outstanding

Threshold section
Level transition
Construction detail

Additional information supports review. It does not automatically resolve a finding.

Revision comparison

See what changed.
Understand what remains.

Use the slider to compare two sample revisions. P03 adds an explicit clear opening dimension. The threshold detail remains outstanding.

P02 / Earlier informationP03 / Added annotation
P03 sample revision with an 850 mm clear opening dimensionP02 sample revision without the clear opening dimension

The deliverable

A clear record.
Not just a list of issues.

Carry the drawing reference, source context and outstanding information into a review your project team can understand.

  1. Identify the drawing and revision.
  2. Record what was reviewed.
  3. Explain the evidence and next action.
Start your own project →
CompliPlanIllustrative sample
CP 024 / 01

Professional review record

Apartment 01

Drawing review · GA 101 · Revision P03

Jurisdiction
Northern Ireland
Building
Dwelling · Apartment
Example scope
Access and ventilation
Outcome
Further information needed
01 / Entrance

Provide the entrance threshold detail

The 850 mm clear opening is recorded. A threshold section is still needed to establish the level transition and construction.

Source context: Technical Booklet R · October 2012 · paragraph 7.8 for threshold guidance.

02 / Supporting information

Provide ventilation design information

The drawing alone does not establish the ventilation provision. Supporting design information remains outstanding.

Illustrative content only. No analysis has been run. This record does not certify compliance or provide Building Control approval.